国产av成人精品播放,中文成人无码精品久久久不卡,国产91在线精品福利,久久综合精品不卡一区二区,成人在线免费视频ww,福利网站导航,精品欧美一区二区三区四区,视频一区二区三区福利在线
      Welcome to the official website of Lihong Safety Equipment Engineering (Shanghai) Co., Ltd.!
      Position首頁 > Home > Evaluation and retrofit > Evaluation/Acceptance
      Evaluation/Acceptance

      Step 1: Risk assessment3c94f36eac1c8dc23861936a347aafb7.jpeg

                   Conduct a standardized risk assessment of the overall equipment, and identify relevant risks, equipment risk severity levels, etc.


      Step 2: Safety transformation

                   According to the risk assessment report, optimize and rectify the equipment with higher risk equipment, and achieve the above PLc standards for machine safety and control system safety


      Step 3: Smart security upgrade

                  According to the equipment standards that have been rectified, add intelligent safety collectors, LOTO intelligent modules, and upgrade to EHS intelligent safety monitoring factory


      Our product range

      Contact us

      400-881-6062

      Lihong Safety Equipment Engineering (Shanghai) Co., Ltd.

      E-Mail: info@lh-safety.com

      Address: 581 Xiuchuan Road, Chuansha Town, Pudong New District, Shanghai

      (Greenland East Coast International Plaza-Room A 313)

      Copyright ? Lihong Safety Equipment Engineering (Shanghai) Co., Ltd.  ICP19034341-1  Technical Support: lanjujing

      Online service

      Online message

    1. Click to refresh